...
首页> 外文期刊>Ship & boat international >Busy times for Cheoy Lee with multiple tug deliveries
【24h】

Busy times for Cheoy Lee with multiple tug deliveries

机译:李瑞龙的繁忙时间有多艘拖船交货

获取原文
获取原文并翻译 | 示例

摘要

Cheoy Lee handed over the first of the series of 13 Z-Tech azimuth stern drive (ASD) tugs -Calovebora - to the ACP in August 2010, followed by the second - Changuinola I -in October 2010, and the third - Sixaola -in December 2010. The three vessels were delivered on schedule, with the remaining 10 units set to follow this theme, said the shipyard. There will nine units delivered over the course of 2011. The final vessel in the order is scheduled for completion in February 2012. The all-steel constructed vessels are almost identical in configuration to the eight vessels previously ordered and constructed for ACP, however the latest Panama tugs are powered by larger, GE 12V228, 2965hp, engines. These larger engines increase bollard pull capabilities to 65tonnes, from 60tonnes previously, in both ahead and astern directions.
机译:Cheoy Lee于2010年8月将13艘Z-Tech方位船尾驱动(ASD)拖船系列中的第一艘移交给了ACP,随后又在2010年10月移交给了Changuinola I,在第三艘将Sixaola移交给了ACP。该船厂说,2010年12月。三艘船如期交付,其余10艘船将遵循这一主题。在2011年期间将交付9艘。该订单的最后一艘船计划于2012年2月完成。全钢结构的船的配置与先前为ACP订购和建造的八艘船几乎相同。巴拿马拖船由更大的GE 12V228、2965hp发动机提供动力。这些更大的发动机将系船柱的牵引能力从之前的60吨增加到了向前和向后的65吨。

著录项

  • 来源
    《Ship & boat international 》 |2011年第janaafeba期| p.5659| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号