...
首页> 外文期刊>Seatrade >Greenfield port development at Al-Wakrah, Qatar, moves ahead
【24h】

Greenfield port development at Al-Wakrah, Qatar, moves ahead

机译:卡塔尔Al-Wakrah的绿地港口开发取得了进展

获取原文
获取原文并翻译 | 示例

摘要

Marine works were due to be completed this summer at Qatar's new Doha Port Project (DPP), which should open by the end of 2016, port officials tell Seatrade. Major excavation works for the new port and flooding of the basin was completed in July, with a total of 12 ship-to-shore cranes manufactured by ZPMC due to be delivered over the summer. The $7.4bn project - described as the world's largest greenfield port development - forms a vital component of Qatar's plans to prepare for the FIFA World Cup in 2022 and install transportation infrastructure such as a new railway.
机译:港口官员告诉Seatrade,海上工程原定于今年夏天在卡塔尔新的多哈港口项目(DPP)中完成,该项目将于2016年年底开放。新港口的重大开挖工程和流域的洪水已于7月完成,ZPMC制造的总计12台岸上起重机将在夏季交付。这项耗资74亿美元的项目被称为世界上最大的未开发港口开发项目,是卡塔尔为2022年FIFA世界杯做准备并安装交通基础设施(如新铁路)的计划的重要组成部分。

著录项

  • 来源
    《Seatrade 》 |2015年第3期| 65-65| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号