首页> 外文期刊>Sea Power >CRITICAL STAGE
【24h】

CRITICAL STAGE

机译:关键阶段

获取原文
获取原文并翻译 | 示例
           

摘要

At $122.3 billion, the Columbia-class program is one of the Navy's very top priorities. The oldest SSBN in the Ohio class, Henry M. Jackson (the first four Ohio-class boats were converted into guided-missile submarines, or SSGNs), began construction in the 1980s and is almost 34 years old. As a result, the Navy knows it needs to field one of the new submarines in the next 10 years in order for operational needs to be met. But some welding problems discovered on the missile tubes have thrown the sub's timeline into doubt. The Columbia-class program is approaching a critical fiscal year as it hopes to field this capability on time, and there are several risks that pose a threat to the schedule. The Columbia-class program is currently in the engineering and manufacturing development phase, and the Navy is conducting detail design and production planning, William Couch, a spokesman for Naval Sea Systems Command, said in an email response to questions from Seapower.
机译:耗资1,223亿美元的哥伦比亚级计划是海军最重要的任务之一。俄亥俄级中最古老的SSBN,亨利·杰克逊(Henry M. Jackson)(前四艘俄亥俄级舰艇被改装为制导导弹潜艇,或SSGN),于1980年代开始建造,已有34年的历史。结果,海军知道在未来10年内需要部署其中一艘新潜艇,以满足作战需求。但是,在导弹导管上发现的一些焊接问题使潜水艇的时间表受到怀疑。哥伦比亚级计划正接近关键的财政年度,因为它希望按时部署此功能,并且有一些风险对进度表构成威胁。海军系统司令部发言人威廉·库奇(William Couch)在一封电子邮件中回答了Seapower的问题,他说,哥伦比亚级计划目前处于工程和制造开发阶段,海军正在进行详细的设计和生产计划。

著录项

  • 来源
    《Sea Power》 |2018年第8期|24-25|共2页
  • 作者

    DANIEL P. TAYLOR;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号