首页> 外文期刊>Sea Power >Go Time for ACV
【24h】

Go Time for ACV

机译:去ACV的时间

获取原文
获取原文并翻译 | 示例
       

摘要

With a renewed focus on operations in the Asia-Pacific region, the increased emphasis on littoral operations will make the Marine Corps' planned Amphibious Combat Vehicle (ACV) a critical capability for the service to have. 1. The plan is to award two engineering and manufacturing development (EMD) contracts to two vendors who would integrate mature technologies into existing platforms, or ACV 1.1. 2. The proposed vehicles will be evaluated on how compatible they would be to evolving to meet requirements for the next phase, ACV 1.2. 3. The four main ACV competitors are BAE Systems, Lockheed Martin, SAIC and General Dynamics.
机译:随着对亚太地区业务的重新关注,对沿海业务的日益重视将使海军陆战队计划中的两栖作战车辆(ACV)成为该服务所具有的关键能力。 1.该计划是授予两个将成熟技术集成到现有平台或ACV 1.1中的供应商的工程和制造开发(EMD)合同。 2.将对拟议的车辆进行评估,使其与进化相适应,以适应下一阶段ACV 1.2的要求。 3. ACV的四个主要竞争对手是BAE Systems,洛克希德·马丁,上汽和通用动力。

著录项

  • 来源
    《Sea Power》 |2015年第5期|20-21|共2页
  • 作者

    DANIEL P. TAYLOR;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 02:44:27

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号