After arriving at the discharge terminal, a pre-discharge inspection consisting of the International Safety Guide for Oil Tankers and Terminals (ISGOTT) ship-shore checklist and a pre-discharge conference were completed before beginning line clearance and discharge of gasoline feedstock. The inspection and conference recorded that the equipment was functional and the vessel was operationally ready for discharge. Line clearance was undertaken for a 45-minute period during which the inert gas system (IGS) was not run. Shortly after completion of the line clearance, the terminal indicated that it was ready for discharge. The chief officer started the IGS and the main cargo discharge pump sequentially. However, the high scrubber water level (HSWL) alarm of the IGS failed, causing the scrubber water pump to trip.
机译:到达卸油码头后,在开始清管和排放汽油原料之前,完成了由国际油轮和码头安全指南(ISGOTT)船上清单组成的卸油前检查和卸油前会议。检查和会议记录了设备的功能,船只已准备好卸货。在不运行惰性气体系统(IGS)的情况下,进行了45分钟的生产线清理。线间隙结束后不久,终端机就表明已准备好放电。首席执行官依次启动了IGS和主卸货泵。但是,IGS的洗涤塔高水位(HSWL)警报失败,导致洗涤塔水泵跳闸。

著录项

  • 来源
    《Safety at Sea International》 |2010年第493期|38|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:43:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号