...
首页> 外文期刊>Rocky Mountain Construction >Pumping Up A Record-Setting Project
【24h】

Pumping Up A Record-Setting Project

机译:推动创纪录的项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In early April 2008, a Putzmeister BSA 14000 SHP-D pump reached yet another world record on the Burj Dubai in the United Arab Emirates with an extraordinary concrete conveying height of 1,988 feet (606 meters). Unimix, the concrete supplier and pumping service for the project, first set its own record with its BSA 14000 SHP-D in May 2007 for reaching a conveying height of 1,483 feet (452 meters) for level 126 of the Burj Dubai, and then in November 2007 it broke a world record by conveying concrete to a height of 1,971 feet (601 meters) for Burj Dubai. The total number of floors at completion for Burj Dubai will not be revealed until the entire project is complete in 2008, but it is already the world's tallest building.
机译:2008年4月上旬,一台Putzmeister BSA 14000 SHP-D泵以1,988英尺(606米)的非凡混凝土输送高度达到了阿拉伯联合酋长国迪拜塔的又一个世界纪录。该项目的混凝土供应商和泵送服务Unimix于2007年5月首次创造了自己的记录,其BSA 14000 SHP-D达到了Burj Dubai 126级的输送高度1,483英尺(452米),然后在2007年11月,它通过向迪拜塔输送高至1,971英尺(601米)的混凝土,打破了世界纪录。在整个项目于2008年完成之前,不会透露迪拜塔竣工的总楼层数,但它已经是世界上最高的建筑物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号