首页> 外文期刊>Road & Transport Research >Collection and evaluation of projected time gap using CAMDAS
【24h】

Collection and evaluation of projected time gap using CAMDAS

机译:使用CAMDAS收集和评估预计的时间差距

获取原文
获取原文并翻译 | 示例
       

摘要

Time gap is by far the most widely accepted measure for drivers' gap acceptance behaviours in gap acceptance studies. Nonetheless, time gap, as conventionally measured after a vehicle clears a fixed reference line in an intersection, is sometimes inadequate in representing gap acceptance behaviours, because it is measured well after a driver's decision-making time. Projected time gap (time gap 'projected' to a fixed reference line at the instance when a driver makes the crossing or merging decision), though intuitively a better measure, is beyond the capability of conventional methods. This paper, adopting CAMDAS ― a Video Image Processing (VIP) software package ― presents a practical approach, which is capable of extracting the distance gaps as well as the associated major-road vehicle approach speeds, and hence the projected time gaps. The relationships between time gap, distance gap, projected time gap and the major- and minor-road vehicle speeds are also established and evaluated.
机译:在差距接受研究中,时间差距是迄今为止驾驶员对差距接受行为的最广泛接受的度量。然而,如通常在车辆通过十字路口的固定基准线之后测量的时间间隙有时不足以表示间隙接受行为,因为该时间间隙是在驾驶员的决策时间之后很好地测量的。预计时间间隔(在驾驶员做出交叉或合并决策时,时间间隔“投影”到固定参考线的时间)尽管直观上是一种更好的方法,但超出了常规方法的能力。本文采用CAMDAS(视频图像处理(VIP)软件包)提出了一种实用的方法,该方法能够提取距离差距以及相关的主要公路车辆进近速度,从而提取预计的时间差距。还建立并评估了时间差距,距离差距,预计时间差距以及主要和次要道路车辆速度之间的关系。

著录项

  • 来源
    《Road & Transport Research》 |2003年第2期|p.42-53|共12页
  • 作者单位

    Office of Infrastructure Research Division of Research and Innovations California Department of Transportation 1101 R Street Sacramento, CA 95814;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输;
  • 关键词

  • 入库时间 2022-08-18 00:22:12

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号