首页> 外文期刊>RIBA Journal >Is it relevant?
【24h】

Is it relevant?

机译:有关系吗?

获取原文
获取原文并翻译 | 示例
       

摘要

Last month, Andy Mather wrote about one way in which the latest City Inn v Shepherd Construction decision impacted upon how architects should administer building contracts. That decision has also thrown into doubt the way in which many architects and lawyers approach extension of time claims. That approach depends upon the wording of the particular building contract. However, most building contracts provide for the contractor to be awarded an extension of time if: 1. a relevant event (late issue of instructions, for example) has occurred; 2. that relevant event has caused a delay in the completion of the works.
机译:上个月,安迪·马瑟(Andy Mather)撰写了一篇有关City Inn诉Shepherd Construction案的最新裁决影响建筑师如何管理建筑合同的方式。这一决定也使许多建筑师和律师处理延期索赔的方式受到质疑。该方法取决于特定建筑合同的措辞。但是,大多数建筑合同规定,如果发生以下情况,则应授予承包商延长时间:1.发生了相关事件(例如,后发指示); 2.有关事件导致工程完工延误。

著录项

  • 来源
    《RIBA Journal》 |2008年第5期|p.84|共1页
  • 作者

    Douglas Wass;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:22:17

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号