首页> 外文期刊>Restoration ecology >Bauxite Mining Restoration by Alcoa World Alumina Australia in Western Australia: Social, Political, Historical, and Environmental Contexts
【24h】

Bauxite Mining Restoration by Alcoa World Alumina Australia in Western Australia: Social, Political, Historical, and Environmental Contexts

机译:美铝世界氧化铝澳大利亚公司在西澳大利亚州进行的铝土矿开采修复:社会,政治,历史和环境环境

获取原文
获取原文并翻译 | 示例
       

摘要

Alcoa World Alumina Australia mines bauxite under lease agreements with the Government of Western Australia. The leases lie in the Darling Range to the east of Perth, the capital and major population center. In addition to bauxite and other mineral ores, the Darling Range is a major potable water source and harbors a species-rich forest dominated by Jarrah (Eucalyptus marginata), a significant commercial timber. Conservation and recreation are important land uses in the region. Social and political pressures have led to stringent governmental requirements for restoration. In addition, a summer drought period, a soil deficient in most nutrients, water management challenges, an introduced disease, caused by Phytophthora cinnamomi Rands, and a post-mining ecosystem that must be conducive to the prescribed burning management of the region pose significant challenges to successful restoration. Alcoa presently mines and restores approximately 550 ha per annum. Although the “footprint” at the end of the life of the mining operations represents only about 4% of the total forest estate, Alcoa is committed to restoring the forest values of the region of all lands impacted by mining. The major objective of restoration is to enhance or maintain forest values by restoring habitat and structural characteristics of the native forest environment. Completion criteria for Alcoa’s mine restoration have been developed. The original Alcoa mine at Jarrahdale has been rehabilitated, and in 2005, a 975-ha area received a “certificate of completion” and was returned to the management control of the State of Western Australia.
机译:美铝世界氧化铝澳大利亚公司根据与西澳大利亚州政府的租赁协议开采铝土矿。租约位于首都和主要人口中心珀斯以东的达令山脉。除铝土矿和其他矿物矿石外,达令山脉也是主要的饮用水来源,并拥有以贾拉(Eucalyptus marginata)(一种重要的商业木材)为主的物种丰富的森林。保护和娱乐是该地区重要的土地利用。社会和政治压力导致政府对恢复提出了严格的要求。此外,夏季干旱时期,大部分养分缺乏的土壤,水管理挑战,由疫霉疫霉引起的引入疾病以及必须有利于该地区规定的焚烧管理的采后生态系统构成了重大挑战。成功恢复。美铝公司目前每年开采和恢复约550公顷土地。尽管采矿活动寿命结束时的“足迹”仅占森林总面积的4%,但美铝致力于恢复受采矿影响的所有土地的森林价值。恢复的主要目的是通过恢复原始森林环境的栖息地和结构特征来提高或维持森林价值。已经制定了美铝矿山恢复的完成标准。 Jarrahdale的原始Alcoa矿山已经修复,2005年,一个975公顷的区域获得了“完工证书”,并交还给了西澳大利亚州的管理控制部门。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号