This research presents the estimation of the hydropower potential of River Otamiri through the hydrological analysis of the elements of climate as it affects its catchment area (section passing through the Federal University of Technology Owerri). The study involves the estimation of maximum design floods for the watershed using the Gumbels Probability Distribution Method for various return periods (T_r) with the development of unit hydrograph, storm hydrograph, runoff hydrograph and flood duration curve for the catchment area of the river. In addition watershed parameters like peak flow (Q_p), lag time (T_l), time of concentration (T_c) and rainfall intensity (I_c) were determined using the soil conservation service method and other empirical formulas. In order to determine the available flow for power generation, the stage/head of the river was estimated from records provided by the River Basin Development Authority (R.B.D.A) and flow duration analyses were carried out. The analysis revealed that for time flows of 50, 75 and 100% the following energy values were obtained 34.5 MW, 11.3 MW and 1.5 MW, respectively.
机译:这项研究通过对气候影响其集水区的气候要素进行水文分析,提出了对Otamiri河水电潜力的估算(通过Owerri联邦技术大学的部分)。这项研究涉及使用Gumbels概率分布法估算各流域的最大设计洪水量,并随着河流集水区单位水位图,暴雨水位图,径流水位图和洪水持续时间曲线的发展而变化。此外,使用土壤保护服务方法和其他经验公式确定了流域参数,例如峰流量(Q_p),滞后时间(T_1),集中时间(T_c)和降雨强度(I_c)。为了确定可用于发电的流量,根据流域发展局(R.B.D.A)提供的记录估算了河流的水位/水头,并进行了流量持续时间分析。分析显示,对于50%,75%和100%的时间流,分别获得以下能量值:34.5 MW,11.3 MW和1.5 MW。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号