首页> 外文期刊>Renewable & Sustainable Energy Reviews >Technical, financial, economic and environmental pre-feasibility study of geothermal power plants by RETScreen - Ecuador's case study
【24h】

Technical, financial, economic and environmental pre-feasibility study of geothermal power plants by RETScreen - Ecuador's case study

机译:RETScreen对地热发电厂的技术,财务,经济和环境前期可行性研究-厄瓜多尔的案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

A technical, financial, economic and environmental analysis of geothermal power plant developments in the Ecuadorian context was analysed by RETScreen-International Geothermal Project Model. Three different scenarios were considered. Scenario I and II considered incentives of 132.1 USD/MWh for electricity generation and grants of 3 million USD. Scenario III considered the geothermal project with an electricity export price of 49.3 USD/MWh. Scenario III was further divided into IIIA and IIIB case studies. Scenario IIIA considered a 3 million USD grant while Scenario IIIB considered an income of 8.9 USD/MWh for selling heat in direct applications. Modelling results showed that binary power cycle was the most suitable geothermal technology to produce electricity along with aquaculture and greenhouse heating for direct use applications in all scenarios. Financial analyses showed that the debt payment would be 5.36 million USD/year under in Scenario I and III. The corresponding values for Scenario II was 7.06 million USD/year. Net Present Value was positive for all studied scenarios except for Scenario IIIA. The equity paybacks were 3.2, 3.7, 16 and 5.6 years for Scenario I, Scenario II, Scenario IIIA and Scenario IIIB, respectively. Overall, Scenario II was identified as the most feasible project due to positive NPV with short payback period. Interestingly, Scenario IIIB could become financially attractive by selling heat for direct applications. Direct applications, public incentives and clean funding mechanisms are essential for the success of geothermal energy projects in the Ecuadorian context. The total initial investment for a 22 MW geothermal power plant was 114.3 million USD (at 2017 costs). Economic analysis showed an annual savings of 24.3 million USD by avoiding fossil fuel electricity generation. More than 184,000 tCO(2) eq. could be avoided annually. Thus, greenhouse emissions avoided by using geothermal energy would bring out environmental benefits and improve the socio-economic benefits in communities.
机译:通过RETScreen-国际地热项目模型对厄瓜多尔境内地热发电厂的发展进行了技术,财务,经济和环境分析。考虑了三种不同的方案。方案I和方案II考虑了132.1美元/兆瓦时的发电奖励和300万美元的赠款。方案三考虑了地热项目,其电力出口价格为49.3美元/兆瓦时。方案III进一步分为IIIA和IIIB案例研究。方案IIIA认为获得了300万美元的赠款,而方案IIIB则认为在直接应用中出售热量的收入为8.9美元/兆瓦时。建模结果表明,二进制功率循环是最合适的地热技术,可在所有情况下直接用于水产养殖和温室供热。财务分析表明,在方案I和方案III下,债务偿还额为每年536万美元。方案二的相应价值为706万美元/年。除方案IIIA外,所有研究方案的净现值均为正。方案I,方案II,方案IIIA和方案IIIB的股权投资回收期分别为3.2、3.7、16和5.6年。总体而言,由于净现值为正且投资回收期短,方案II被认为是最可行的项目。有趣的是,方案IIIB通过出售直接应用的热量可以在财务上变得有吸引力。在厄瓜多尔背景下,直接申请,公共奖励措施和清洁供资机制对于地热能项目的成功至关重要。 22兆瓦地热发电厂的总初始投资为1.143亿美元(按2017年成本计算)。经济分析表明,通过避免使用化石燃料发电,每年可节省2430万美元。超过184,000 tCO(2)eq。可以每年避免。因此,通过使用地热能避免温室气体排放将带来环境效益并改善社区的社会经济效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号