首页> 外文期刊>Renewable Power Generation, IET >Short-circuit analysis of pumped storage unit during back-to-back starting
【24h】

Short-circuit analysis of pumped storage unit during back-to-back starting

机译:背对背启动期间抽水存储单元的短路分析

获取原文
获取原文并翻译 | 示例
           

摘要

Back-to-back starting is a widely accepted starting method for pumped storage units. A back-to-back starting model of pumped storage units was built using the ElectroMagnetic Transients Program including DC (EMTDC) software package. The short-circuit fault during back-to-back starting was investigated for the first time. The starting process was simulated and compared with real data from a pumped storage power plant in northeast China. The rotor speed and the effect of resistance during fault period were also discussed. The results showed that the fault current has significant magnitude and low-frequency characteristic. Recommendations were provided to realise secure and reliable fault clearance during back-to-back starting based on the fault characteristics and real de-excitation test results of the pumped storage power plant.
机译:背对背启动是泵送存储单元广泛接受的启动方法。使用包括DC(EMTDC)软件包的电磁暂态程序,建立了抽水蓄能单元的背靠背启动模型。首次研究了背对背启动过程中的短路故障。对启动过程进行了模拟,并与来自中国东北某抽水蓄能电厂的实际数据进行了比较。还讨论了转子速度和故障期间电阻的影响。结果表明,故障电流具有明显的幅度和低频特性。根据抽水蓄能电站的故障特性和实际去磁测试结果,提出了在背对背启动过程中实现安全可靠的故障排除的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号