首页> 外文期刊>IEEE Transactions on Energy Conversion >Design and testing of a back-to-back starting system for pumped storage hydrogenerators at Mt. Elbert Powerplant
【24h】

Design and testing of a back-to-back starting system for pumped storage hydrogenerators at Mt. Elbert Powerplant

机译:芒特抽水蓄能式氢气发生器背靠背启动系统的设计和测试。艾伯特发电厂

获取原文
获取原文并翻译 | 示例
       

摘要

The design and testing of a back-to-back starting system for pumped storage hydrogenerators is described. Marginal reliability of the existing static starting system adversely affected availability of the two 170000 hp pumps. An alternative method of starting a unit in the pump mode was needed to increase plant availability and to provide interim starting capability for a planned static starter replacement. A back-to-back starting system that allows one unit, operating in generate mode, to synchronously start the other unit as a motor was designed. Field testing demonstrated the viability of back-to-back starting of the pumped storage units.
机译:描述了用于抽水蓄能式水轮发电机的背对背启动系统的设计和测试。现有静态启动系统的边际可靠性严重影响了两个170000 hp泵的可用性。需要一种以泵模式启动装置的替代方法,以提高工厂的可用性并为计划的静态启动器更换提供临时启动能力。设计了一种背对背启动系统,该系统允许一个单元在发电模式下运行,从而作为电动机同步启动另一个单元。现场测试证明了抽水式蓄能器背靠背启动的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号