...
首页> 外文期刊>Renewable energy world magazine >OFFSHORE WIND FOUNDATIONS: CHALLENGES AND INNOVATIONS IN DESIGN AND DEVELOPMENTS
【24h】

OFFSHORE WIND FOUNDATIONS: CHALLENGES AND INNOVATIONS IN DESIGN AND DEVELOPMENTS

机译:海上风电基金会:设计和开发中的挑战和创新

获取原文
获取原文并翻译 | 示例

摘要

Although still only a tiny fraction of the world's installed wind capacity, offshore wind is about to explode. BTM Consult - see page 31 - predicts that more than 16 GW of new offshore will be installed by the end of 2014, with a global total of 75 GW by 2020. As turbine foundations comprise a quarter to a third of the overall cost of an installed offshore turbine, depending on water depth, turbine size and who you talk to, today's foundation designers have a tough remit: develop new designs and installation procedures to cope with deeper water challenges - while simultaneously reducing the cost of manufacture, deployment and operation.
机译:尽管仍仅占世界风电装机容量的一小部分,但海上风电仍将爆炸。 BTM Consult-参见第31页-预测到2014年底将安装超过16吉瓦的新海上设备,到2020年全球安装总量将达到75吉瓦。由于涡轮机基础仅占总成本的四分之一至三分之一。根据水深,涡轮机尺寸以及您与之交谈的人,已安装的海上涡轮机是当今的基础设计人员的艰巨任务:开发新的设计和安装程序以应对更深的水上挑战-同时降低制造,部署和运营的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号