首页> 外文期刊>Reliability Engineering & System Safety >Prioritizing and quantifying the risk of outstanding corrective actions
【24h】

Prioritizing and quantifying the risk of outstanding corrective actions

机译:优先处理和量化未采取纠正措施的风险

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents methods for assessing the risk of outstanding corrective actions, and describes how the methods were applied at a nuclear power station. The methods are motivated by a current industry focus on risk--informed operation and a current NRC focus on risk- informed regulation. Application of the methods provides' (l ) a risk--informed basis for establishing schedules and allocating resources to implement corrective actions; (2) a risk-informed basis for justifying continued operation until corrective actions are implemented.
机译:本文介绍了评估出色纠正措施风险的方法,并介绍了这些方法如何在核电站中应用。这些方法是由当前行业关注风险-知情操作和当前NRC关注风险知情监管的动机所推动的。方法的应用为(l)建立进度表和分配资源以实施纠正措施提供了风险告知的基础; (2)有风险依据的依据,以证明继续进行操作直至采取纠正措施为止。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号