An algorithm for enhancing spatiotemporal resolution of probabilistic risk assessment to address emergent safety concerns in nuclear power plants

机译:一种提高概率风险评估的时空分辨率以解决核电厂紧急安全问题的算法

获取原文
获取原文并翻译 | 示例
           

摘要

Emergent safety concerns often involve complex spatiotemporal phenomena. In addressing these concerns, the classical Probabilistic Risk Assessment (PRA) of Nuclear Power Plants (NPPs) has limitations in generating the required resolution for risk estimations. The existing dynamic PRAs have yet to demonstrate their feasibility for implementation in a plant. In addition, due to the widespread use of classical PRA in the nuclear industry and by the regulatory agency, a transition to a fully dynamic PRA would require a significant investment of resources. As a more feasible alternative, the authors have developed the Integrated PRA (I-PRA) methodology to add realism to risk estimations by explicitly incorporating time and space into underlying models of the events in the plant PRA while avoiding significant changes to its structure. In I-PRA, the failure mechanisms associated with the areas of concern (e.g., fire, Generic Safety Issue 191) were modeled in separate simulation modules, which were then integrated with the plant PRA through a probabilistic interface. This paper (i) provides theoretical foundations for the incorporation of time and space into PRA and (ii) introduces an algorithm that helps execute I-PRA in a way to gradually enhance spatiotemporal resolution of plant PRAs to efficiently address emergent safety concerns.
机译:紧急安全问题通常涉及复杂的时空现象。在解决这些问题时,核电厂(NPPs)的经典概率风险评估(PRA)在生成风险估计所需的解决方案方面存在局限性。现有的动态PRA尚未证明其在工厂中实施的可行性。此外,由于经典PRA在核工业中以及监管机构的广泛使用,向全动态PRA的过渡将需要大量的资源投资。作为一种更可行的替代方法,作者开发了集成PRA(I-PRA)方法,通过将时间和空间明确地合并到工厂PRA中事件的基础模型中,同时避免了对其结构的重大更改,从而增加了风险估计的真实性。在I-PRA中,与关注区域相关的故障机制(例如火灾,通用安全问题191)在单独的仿真模块中建模,然后通过概率接口与工厂PRA集成。本文(i)为将时间和空间纳入PRA提供了理论基础,并且(ii)引入了一种有助于执行I-PRA的算法,以逐步提高植物PRA的时空分辨率的方式来有效解决紧急安全问题。

著录项

  • 来源
    《Reliability Engineering & System Safety》 |2019年第5期|405-428|共24页
  • 作者单位

    UIUC, Urbana, IL 61801 USA|UIUC, Sociotech Risk Anal SoTeRiA, IAP, Urbana, IL USA|UIUC, Dept Nucl Plasma & Radiol Engn, Urbana, IL USA;

    UIUC, Urbana, IL 61801 USA|UIUC, Sociotech Risk Anal SoTeRiA, IAP, Urbana, IL USA|UIUC, Dept Nucl Plasma & Radiol Engn, Urbana, IL USA;

    UIUC, Urbana, IL 61801 USA|UIUC, Sociotech Risk Anal SoTeRiA, IAP, Urbana, IL USA|UIUC, Beckman Inst Adv Sci & Technol, Urbana, IL USA|UIUC, Illinois Informat Inst, Urbana, IL USA;

    UIUC, Urbana, IL 61801 USA|UIUC, Sociotech Risk Anal SoTeRiA, IAP, Urbana, IL USA|UIUC, Dept Nucl Plasma & Radiol Engn, Urbana, IL USA;

    UIUC, Urbana, IL 61801 USA|UIUC, Sociotech Risk Anal SoTeRiA, IAP, Urbana, IL USA|UIUC, Dept Nucl Plasma & Radiol Engn, Urbana, IL USA;

    UIUC, Urbana, IL 61801 USA|UIUC, Sociotech Risk Anal SoTeRiA, IAP, Urbana, IL USA|UIUC, Dept Nucl Plasma & Radiol Engn, Urbana, IL USA|UIUC, Beckman Inst Adv Sci & Technol, Urbana, IL USA|UIUC, Illinois Informat Inst, Urbana, IL USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Integrated Probabilistic Risk Assessment (I-PRA); Generic Safety Issue 191 (GSI-191); Nuclear promise; Fire PRA; Risk-informed regulation; Dynamic PRA;

    机译:综合概率风险评估(I-PRA);通用安全第191期(GSI-191);核承诺;火灾PRA;风险知情的法规;动态PRA;