首页> 外文期刊>Railways Illustrated >Diesels on the Highland Line PART 1 The 1960s and 1970s
【24h】

Diesels on the Highland Line PART 1 The 1960s and 1970s

机译:柴油机在20世纪60年代和20世纪70年代的高地线第1部分

获取原文
获取原文并翻译 | 示例
           

摘要

The Highland Main Line (HML) is one of, if not the, toughest routes for traction in the UK. The line includes the highest point on the BR network at Druimuachdar Summit, standing at 1,484ft above sea level, and further north Slochd Summit reaches 1,315 ft. Both summits have fearsome approaches in both directions. With these, coupled with the cost of getting coal to Inverness and factoring in the bleak winter weather, it was not surprising that the route was a priority for dieselisation. On June 18, 1958, Brush Type 2 D5511 was sent north from Edinburgh to Perth for trials in the Highlands. After being used for crew familiarisation it was noted working the morning Inverness-Perth parcels on July 5, before undertaking a stint in the Edinburgh area. It was back on Inverness shed on August 4 and powered the afternoon freight to Wick the next day. It also worked on the West Highland Line during its trials but was back on the Eastern Region at the start of September. It would be another 15 months before diesels arrived at Inverness permanently.
机译:高地主线(HML)是英国牵引的最艰难的航线之一。该行包括德鲁莫克达峰会上的BR网络上的最高点,站在海平面上方1,484英尺处,北方斯洛克峰会达到1,315英尺。这两个峰会都有令人毛骨悚然的方法。有了这些,再加上煤炭到寒冷的冬季天气中的煤炭和考虑的成本,这并不奇怪,这条路线是模糊化的优先事项。 1958年6月18日,刷2 D5511从爱丁堡到珀斯送到了高地的珀斯。在用于船员熟悉之后,它在7月5日之前在7月5日工作,然后在爱丁堡地区进行了一场精神,举行了早晨的因弗内斯珀斯包。它回到了8月4日的因弗内斯,并推动了下午的货物来克粉灯。它还在其试验期间在西部高地线路工作,但在9月初回到了东部地区。柴油永久抵达因弗内斯之前,这将是另外15个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号