...
首页> 外文期刊>Railways Illustrated >Tarka Valley Railway £50,000 appeal
【24h】

Tarka Valley Railway £50,000 appeal

机译:塔卡谷铁路(Tarka Valley Railway)上诉金额为50,000英镑

获取原文
获取原文并翻译 | 示例
           

摘要

THE TARKA Valley Railway has had a successful year and is poised to complete the trackwork for Phase 1 of its extension project to link Torrington and Bideford (five miles). The appeal is to raise the money needed for the purchase of a right handed point and accessories to lead from the main line to the up side siding at Torrington station. The rail and sleepers needed to complete this first extension are already on site awaiting installation once the new point is in place. Following the acquisition of a lease from Devon County Council in April 2018 for land adjacent to the Tarka Trail, progress on site has been remarkable. Four panels of track have been added, and a new pedestrian level crossing installed, permitting the public to cross to the Tarka Trail.
机译:塔卡河谷铁路公司(TARKA Valley Railway)取得了成功的一年,并准备完成连接托林顿和比迪福德(5英里)的扩建项目第一阶段的工程。呼吁是筹集资金,购买右手点和配件,以从干线通向Torrington站的上侧壁板。完成新的扩展后,完成第一个扩展所需的滑轨和轨枕已经在现场,等待安装。在2018年4月从德文郡议会获得了与塔尔卡步道(Tarka Trail)相邻的土地的租约之后,现场进展显着。添加了四个轨道板,并安装了新的行人过路处,使公众可以越过Tarka步道。

著录项

  • 来源
    《Railways Illustrated》 |2019年第12期|22-22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号