首页> 外文期刊>Railways Illustrated >NRM agrees Lord Nelson test programme
【24h】

NRM agrees Lord Nelson test programme

机译:NRM同意纳尔逊勋爵的测试计划

获取原文
获取原文并翻译 | 示例
           

摘要

A testing programme for 850 Lord Nelson has been agreed following detailed examination of its boiler after several firebox stays sheared. No major structural damage to the boiler has been found and there are no broken stays. Boilersmith John Glaze has agreed an eight-stage programme for the locomotive to ensure its suitability for future operation. NRM Head of Knowledge and Collections Helen Ashby said: "Naturally we can only proceed from one stage to the next once it has proved successful with no further major leakages in the boiler.
机译:在几个火箱保持剪切状态后,对锅炉进行了详细检查,并同意了850号纳尔逊勋爵的测试计划。没有发现对锅炉的重大结构损坏,也没有断裂的支柱。锅炉匠John Glaze已同意该机车的八阶段计划,以确保其适合未来运行。 NRM知识和收集负责人Helen Ashby说:“自然而然,只有事实证明我们成功了,锅炉再无重大泄漏,我们才能从一个阶段进入下一阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号