...
首页> 外文期刊>Railways Illustrated >Class 108 Project Nears Completion
【24h】

Class 108 Project Nears Completion

机译:108类项目即将竣工

获取原文
获取原文并翻译 | 示例

摘要

A programme to replace all the cab fronts of the Class 108s owned by the Dean Forest Railway is close to completion after Driving Motor Brake 51914 was moved into the shed. The Derby-built Class 108s were largely made or aluminium, but had steel cab fronts fitted to improve crashworthiness. These cab fronts have proved to be a problem in preservation, with corrosion above the windscreens and at the cab bottom being a particular issue. As a result, several railways have had new cab fronts pressed out of aluminium, which completely replaces the existing steelwork.
机译:在将驱动马达制动器51914移入车棚后,更换迪恩森林铁路公司拥有的108级所有驾驶室前部的计划即将完成。德比(Derby)制造的Class 108很大程度上是用铝制成的,但安装了钢制驾驶室前面板以提高耐撞性。这些驾驶室前部已被证明是保存上的问题,前挡风玻璃上方和驾驶室底部的腐蚀是一个特别的问题。结果,有几条铁路采用铝制压制了新的驾驶室面板,从而完全取代了现有的钢结构。

著录项

  • 来源
    《Railways Illustrated》 |2015年第12期|36-36|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号