...
首页> 外文期刊>Railways Illustrated >More Ordsall Chord Delays
【24h】

More Ordsall Chord Delays

机译:更多Ordsall和弦延迟

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Ordsall Chord project in Manchester looks set to be delayed further following a legal challenge to the Secretary of State's March decision to grant a Transport & Works Act Order for the scheme. The challenge, which will be heard at the High Court in September, is being made by Mark Whitby, former president of the Institution of Civil Engineers and an objector at the 2014 public enquiry. His objection majors on the impact the construction will have on the Museum of Science and Industry (MOSI) and the fact that the proposed route will bisect the route of the original Manchester-Liverpool railway.
机译:在对国务卿三月关于批准该计划的交通与工程法令的决定提出法律质疑之后,曼彻斯特的Ordsall Chord项目似乎将进一步推迟。这项挑战将于9月份在高等法院进行审理,由土木工程师协会前主席,2014年公开调查的反对者马克·惠特比(Mark Whitby)提出。他的反对意见主要涉及该建筑对科学和工业博物馆(MOSI)的影响以及拟议中的路线将原曼彻斯特-利物浦铁路的路线一分为二的事实。

著录项

  • 来源
    《Railways Illustrated》 |2015年第9期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号