【24h】

Technical Article

机译:技术文章

获取原文
获取原文并翻译 | 示例
           

摘要

The topographical data are-fundamental to the block design development and verification processes and need to be as accurate as possible before the design calculations begin. For existing track, this information can be obtained prior to the development of the initial block design using data from a previous or new instrument survey. For new lines or for existing lines where the track geometry is expected to change, the locations and extents of grades, curves, switch points, and station platforms, as provided to the block designer, must be maintained during the construction phase. Failure to keep the topography consistent throughout the life of the project may well result in significant changes to the block design, which cascade to project schedule delays and cost overruns due to rework - impacts that escalate as project work progresses.
机译:地形数据是模块设计开发和验证过程的基础,并且在设计计算开始之前需要尽可能准确。对于现有轨道,可以使用来自先前或新仪器勘测的数据在开发初始模块设计之前获取此信息。对于新线路或预期轨道几何形状会改变的现有线路,必须在施工阶段维护提供给块设计者的坡度,曲线,转换点和车站平台的位置和范围。如果在项目的整个生命周期中都无法保持地形一致,则很可能会导致模块设计发生重大变化,从而导致项目进度延迟和返工造成的成本超支-随着项目工作的进行,影响逐步升级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号