【24h】

Technical Article

机译:技术文章

获取原文
       

摘要

There are many potential pitfalls that can seriously affect a project when the independent verification of a previously developed block design is required. The hope of this discussion is to identify areas where problems may arise, and to offer suggestions on how to mitigate them.When a transit property decides to embark upon new construction, a line extension or an upgrade of an existing control system, one of the earliest and most fundamental signaling tasks that needs to be performed for a fixed-block system with cab signals is the development of a block design for the affected line segment.
机译:当需要对先前开发的模块设计进行独立验证时,有很多可能会严重影响项目的潜在陷阱。讨论的希望是确定可能出现问题的区域,并提出如何缓解这些问题的建议。当过境财产决定着手进行新的建筑,线路的扩建或对现有控制系统的升级时,对于带有驾驶室信号的固定模块系统,需要执行的最早也是最基本的信号任务是开发受影响的线段的模块设计。

著录项

  • 来源
    《Railway track and structures》 |2008年第3期|13-14|共页
  • 作者

    Peter A. Matiukas;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:29:08

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号