【24h】

MSE wall rebuild

机译:MSE墙重建

获取原文
获取原文并翻译 | 示例
       

摘要

Herzog's MPM rebuilds a mechanically stabilized earth wall on Denver Regional Transportation District's light rail tracks in two weeks.rnIn the early hours of Jan. 17, 2009, 18 freight cars carrying molten sulfur derailed on a main line running beside the Regional Transportation District's light rail tracks in Littleton, Colo. Not only did the derailment damage two of three main lines, but also the mechanically stabilized earth wall supporting one of RTD's two light rail tracks, located six feet above the main line tracks.rnHerzog Contracting Corp. sent two of its MPMs to aid in the clean up and begin repairs. One came from just north of Denver, while the second was rerouted to Littleton on its way to Iowa. According to Herzog, the machines had experience working in tight quarters and performing trackway wash-out work, but never before had they been used to perform wall replacement.
机译:Herzog的MPM在两周内在丹佛地区运输区的轻轨上重建了机械稳定的土墙。rn在2009年1月17日凌晨,18辆载有熔融硫磺的货车在地区运输区的轻轨旁的一条主线上脱轨。脱轨不仅损坏了三条主线中的两条,而且还损坏了机械支撑的RTD两条轻轨中的一条的机械稳定土墙,该两条轻轨位于主线上方六英尺处。rnHerzogContracting Corp.发送了两条其MPM有助于清理并开始维修。其中一个来自丹佛北部,而第二个则在前往爱荷华州的途中改道至利特尔顿。据赫尔佐格(Herzog)说,这台机器曾在狭窄的地方工作并执行过道冲洗工作,但从未有过用于墙壁更换的经验。

著录项

  • 来源
    《Railway track and structures》 |2009年第5期|29-3033|共3页
  • 作者

    Mischa Wanek-Libman;

  • 作者单位

    Herzog's MPM lowers sections of the reconstructed MSE wall into place along light rail tracks in Littleton, Colo.;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:28:12

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号