首页> 外文期刊>Railway Track and Structures >A different way of doing things
【24h】

A different way of doing things

机译:一种不同的做事方式

获取原文
获取原文并翻译 | 示例
       

摘要

The enormous price tag associated with Positive Train Control captures a lot of the headlines in this industry. For the railroads that are mandated to implement the technology, more practical matters capture their focus, such as what conduits need to be installed and in what location in order to be ready by the 2015 deadline.rnFor BNSF, placing the c&s infrastructure needed along its property in the western suburbs of Chicago came with it's own set of challenges. The area is heavily populated and located along a busy freight and passenger corridor.
机译:与正面列车控制相关的巨大价格标签吸引了该行业的许多头条新闻。对于被要求实施该技术的铁路,更多的实际问题抓住了他们的重点,例如需要在2015年截止日期之前安装什么管道以及在什么位置准备就绪。对于BNSF,将所需的c&s基础设施放在芝加哥西郊的房地产面临着一系列挑战。该地区人口稠密,位于繁忙的货运和旅客走廊旁。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号