首页> 外文期刊>Railway Track and Structures >CHSRA holds official ground breaking ceremony for HSR project
【24h】

CHSRA holds official ground breaking ceremony for HSR project

机译:CHSRA举行高铁项目动土仪式

获取原文
获取原文并翻译 | 示例
       

摘要

The California High-Speed Rail Authority joined hundreds of supporters and government, student, community, transportation, business and labor leaders in early January to break ground on its highspeed rail system. "What is important is the connection that we are rooted in our forebears and we are committed and linked to our descendants," said California Gov. Edmund G. Brown Jr. at a ceremony held at the site of the future high-speed rail station in downtown Fresno. "And the high-speed rail links us from the past to the future, from the south to Fresno and north; this is truly a California project bringing us together today."
机译:1月初,加利福尼亚州高铁管理局与数百名支持者以及政府,学生,社区,运输,商业和劳工领导人一起,在高铁系统方面取得了突破。加利福尼亚州州长埃德蒙·布朗(Edmund G. Brown Jr.)在未来的高铁站现场举行的仪式上说:“重要的是,我们扎根于前辈,我们决心与后代保持联系。”在弗雷斯诺市中心。 “高铁从过去到未来,从南方到弗雷斯诺再到北部,将我们连接起来;这确实是一个加利福尼亚项目,今天将我们团结在一起。”

著录项

  • 来源
    《Railway Track and Structures》 |2015年第2期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:23:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号