首页> 外文期刊>Railway Track and Structures >Track Construction Machine helping double track NHHS rail line
【24h】

Track Construction Machine helping double track NHHS rail line

机译:轨道施工机帮助双轨NHHS铁路线

获取原文
获取原文并翻译 | 示例
       

摘要

Double track construction is getting a boost on portions of the New Haven-Hartford-Springfield (NHHS) passenger line thanks to a new Track Construction Machine (TCM). Connecticut Gov. Dannel P. Malloy and Connecticut Department of Transportation (CTDOT) Commissioner James P. Redeker unveiled the mammothTCM made by Harsco Rail that is being used to double-track portions of the NHHS Line, which is being branded as the CTrail Hartford Line.
机译:得益于新的履带施工机(TCM),双轨建设正在推动纽黑文-哈特福德-斯普林菲尔德(NHHS)客运线路的一部分。康涅狄格州州长Dannel P. Malloy和康涅狄格州交通部(CTDOT)专员James P. Redeker揭露了Harsco Rail制造的mammothTCM,该产品被用于对NHHS线路的一部分进行双轨运输,并被冠以CTrail Hartford Line品牌。

著录项

  • 来源
    《Railway Track and Structures》 |2016年第11期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:22:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号