首页> 外文期刊>Railway Track and Structures >WMATA's final SafeTrack plan to tackle safety, maintenance holes
【24h】

WMATA's final SafeTrack plan to tackle safety, maintenance holes

机译:WMATA的最终SafeTrack计划解决安全,维护漏洞

获取原文
获取原文并翻译 | 示例
       

摘要

The Washington Metropolitan Transportation Authority (WMATA) released its final Safe Track plan, which is an accelerated maintenance effort that aims to compress three years worth of work into one year. The plan significantly expands maintenance time on weekends, weeknights and midday hours and includes 15 "Safety Surges"- long-duration track outages for major projects in key parts of the system. The plan addresses Federal Transit Administration (FTA) and National Transportation Safety Board (NTSB) safety recommendations and deferred maintenance backlogs while restoring track infrastructure to good health.
机译:华盛顿大都会运输管理局(WMATA)发布了最终的安全跟踪计划,该计划是一项加速的维护工作,旨在将三年的工作量压缩为一年。该计划大大延长了周末,工作日和中午的维护时间,并包括了15次“安全突击”,这是系统关键部分大型项目的长时间停机。该计划解决了联邦运输管理局(FTA)和国家运输安全委员会(NTSB)的安全建议,并推迟了积压的维修工作,同时恢复了轨道基础设施的健康。

著录项

  • 来源
    《Railway Track and Structures》 |2016年第6期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:22:34

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号