【24h】

STEALTH MODE

机译:隐身模式

获取原文
获取原文并翻译 | 示例
       

摘要

Think of it as stealth construction. On most major urban projects, long before the first bucket of dirt has been scooped, the first pile driven, even the first property corner verified, work, in the form of pre-construc-tion survey and monitoring, has already been set in place. Critical for identifying existing conditions of adjacent properties before work begins, then monitoring those same properties-and others-for movement after startup, these facets can be as important to a design-build team as the project itself. In an ongoing project to add a third track to a 10-mile segment on the main corridor of the Long Island Rail Road (LIRR), Bronx, N.Y.-based Vibran-alysis is undertaking that effort throughout the length of the $1.8 billion project. Utilizing an arsenal of total stations, optical prisms, and an abundance of geotechnical, structural and environmental monitoring sensors, the company is helping ensure that the "before" picture is documented and any "after" events can be quickly identified and mitigated.
机译:将其视为隐形构造。在大多数大型城市项目中,在挖出第一桶土之前很早,就已经进行了以施工前勘测和监测的形式进行的第一桩打桩,甚至是第一个物业角点的检验。 。对于在启动工作之前确定相邻属性的现有条件,然后监视这些相同的属性以及其他属性(对于启动后的移动)至关重要,这些方面对于设计构建团队而言与项目本身一样重要。在正在进行的将长岛铁路(LIRR)主走廊上的10英里路段增加第三条轨道的项目中,总部位于纽约州布朗克斯的Vibran-alysis在这项耗资18亿美元的项目的整个过程中都在努力。利用全站仪,光学棱镜以及大量的岩土,结构和环境监测传感器,该公司正在帮助确保记录“之前”的图片,并可以快速识别和识别“任何”事件。缓解。

著录项

  • 来源
    《Railway Track and Structures》 |2019年第9期|283032-33|共4页
  • 作者

    Larry Trojak;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:29:35

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号