...
首页> 外文期刊>Railway Gazette International >JR West to develop dual-gauge Shinkansen bogie
【24h】

JR West to develop dual-gauge Shinkansen bogie

机译:JR West开发双轨新干线转向架

获取原文
获取原文并翻译 | 示例

摘要

March 14 2015 sees the opening of the Hokuriku Shinkansen extension from Nagano to Kanaz-awa, when the Series E7 and W7 train-sets belonging to JR East and JR West will begin operating through services between Tokyo and Kanazawa. Work is already underway on the next section from Kanazawa to Tsu-ruga via Hukui, although this is not expected to be completed until 2026. The long-term strategy envisages that the Hokuriku Shinkansen will eventually be extended to Osaka, but the third phase has not yet been approved by the government pending a decision on the preferred alignment.
机译:2015年3月14日,北陆新干线从长野到金泽市的扩建通车,属于JR East和JR West的E7和W7系列火车将通过东京和金泽之间的服务开始运营。从金泽到福冈的鹤沼的下一段工程已经在进行中,尽管预计到2026年才能完成。长期战略设想北陆新干线最终将扩展到大阪,但第三阶段已经完成。尚未获得政府的批准,尚待就首选对齐方式做出决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号