首页> 外文期刊>Railway Gazette International >Completion of Shinkansen network on the horizon
【24h】

Completion of Shinkansen network on the horizon

机译:新干线网络即将完工

获取原文
获取原文并翻译 | 示例
           

摘要

Passage of the first Series H5 trainset through the 53.9 km Seikan tunnel linking Japan's main island of Honshu with Hokkaido on May 24 marked yet another landmark in the development of Japan's Shinkansen network. More milestones will follow soon — the next significant event will be opening of the 148.9 km section of the Hokkaido Shinkansen as far as Hakodate in December 2016. The project is already well advanced, with tracklaying completed in November 2014. To be operated by JR Hokkaido, it connects end-on with JR East's Tohoku Shinkansen at Shin-Aomori, allowing the two companies to offer through trains between Tokyo and Hakodate in just 4 h 8 min, compared with 5 h 22 min for the best connection today. At present rail has only a 14% share of the 1.2 million trips made to or from Hakodate, compared with 78% of the 3.2 million between Tokyo and Aomori, where the best journey time for the 713.7 km is 2 h 59 min.
机译:5月24日,首批H5系列火车通过53.9公里的青函隧道连接日本本州和北海道,标志着日本新干线网络发展的又一个里程碑。即将到来的更多里程碑事件-下一个重大事件将是于2016年12月开放北海道新干线148.9公里的一段,直至函馆。该项目已经进展顺利,2014年11月完成了赛道铺设。将由JR北海道运营,它与新青森县的JR East的东北新干线进行了终点连接,从而使两家公司可以在4小时8分钟内通过东京和函馆之间的火车提供服务,而今天的最佳连接是5小时22分钟。目前,在往返函馆的120万次旅行中,铁路仅占14%的份额,相比之下,东京和青森之间的320万次旅行中,铁路的份额为78%,其中713.7公里的最佳旅行时间为2小时59分钟。

著录项

  • 来源
    《Railway Gazette International》 |2015年第7期|34-35|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号