...
首页> 外文期刊>Railway Age >ATC for Shanghai Metro extensions
【24h】

ATC for Shanghai Metro extensions

机译:上海地铁扩展的ATC

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Union Switch & Signal has been awarded two contracts worth $22.31 million for ATC (automatic train control) on extensions of the Shanghai Metro Line 2. The first contract is for the Shanghai Line 2 East Extension project, which will extend the existing system eastward by 18.37 miles to provide service to Pudong International Airport. The second contract is for the Hongqiao Integrated Transportation Hinge Mating project ("West-West Extension"), a westward extension of 5.32 miles that will link the present system with Hongqiao Airport. US&S's contract values for the two projects are $17.63 million and $4.68 million, respectively. US&S will supply its AF-900 profile-based ATC system for signaling and train control. AF-900 integrates ATP (automatic train protection), ATO (automatic train operation), and ATS (automatic train supervision).
机译:Union Switch&Signal已获得上海地铁2号线扩建项目的两份总价值2231万美元的ATC(自动列车控制)合同。第一份合同是上海2号线东扩建项目,该项目将向东扩展现有系统18.37英里提供浦东国际机场的服务。第二份合同是虹桥综合交通枢纽配合项目(“西-西扩展”),该项目向西扩展了5.32英里,它将把当前系统与虹桥机场连接起来。 US&S的两个项目的合同价值分别为1763万美元和468万美元。 US&S将提供其基于AF-900配置文件的ATC系统,用于信号和列车控制。 AF-900集成了ATP(自动列车保护),ATO(自动列车运行)和ATS(自动列车监控)。

著录项

  • 来源
    《Railway Age》 |2008年第7期|p.18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号