...
首页> 外文期刊>Rail >HS2 reveals the cost to the public purse of protests
【24h】

HS2 reveals the cost to the public purse of protests

机译:HS2揭示了抗议活动的公共钱包的成本

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

HS2 Ltd Chief Executive Mark Thurston has called for more government support to tackle the "increasingly violent and disruptive" protests being mounted against the mega-project. Speaking to Parliament's Public Accounts Committee (PAC) on June 24, Thurston revealed that dealing with direct action from opponents of the scheme has cost some £75 million to date. Meanwhile, more than 300 arrests have been made with nine prosecutions against people disrupting construction of Phase 1 of the line between London and Birmingham, and of Phase 2a from the West Midlands to Crewe. HS2 has faced a rising tide of direct action which included the removal of activists in February from tunnels dug at Euston to hold up contractors (RAIL 924). Around the same time, a long-running protest camp was shut down near to HS2's largest construction site in the Colne Valley, while there were also well- publicised clashes with bailiffs and police in April as protestors were removed from Jones' Hill Wood in Buckinghamshire (a 4.1- acre woodland believed to have inspired Roald Dahl).
机译:HS2 LTD首席执行官标志Thurston呼吁更多政府支持,以解决对巨型项目的“越来越暴力和破坏性”抗议。介于6月24日与议会的公共账目委员会(PAC)谈到,瑟斯顿透露,从该计划的对手处理直接行动已经花费约7500万英镑。与此同时,已有300多次逮捕,遭受九个起诉,禁止伦敦和伯明翰之间的第1阶段建设,以及从西米德兰斯到筹集的第2阶段。 HS2面临着直接行动的上升潮流,其中包括从欧森顿挖掘隧道挖掘的2月份活动家,以阻止承包商(轨道924)。在同时,在Colne Valley的HS2最大的建筑工地附近关闭了一个漫长的抗议营地,而4月份南瓜在白金汉郡的琼斯的山顶拆除抗议者,也在4月份宣传拘留的冲突。 (4.1英亩的林地认为罗尔德DAHL的启发)。

著录项

  • 来源
    《Rail》 |2021年第935期|24-25|共2页
  • 作者

    Paul Stephen;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号