首页> 外文期刊>Rail >£50 million to rebuild Doric Arch
【24h】

£50 million to rebuild Doric Arch

机译:5000万英镑重建多立克拱

获取原文
获取原文并翻译 | 示例
           

摘要

Reconstructing the Doric Arch at Euston would cost more than £50 million and include challenges relating to the recovery of original construction materials, says HS2 Minister Andrew Stephenson. In a Commons Written Reply on October 16 to Michael Fabricant (Conservative, Lichfield), about reconstructing the Arch as part of the Euston redevelopment, Stephenson said: "In the Masterplan for Euston station, our development partner, Lendlease, is considering how the history of the station at Euston should influence and best be reflected in the future designs."
机译:HS2部长Andrew Stephenson表示,重建欧森顿的多立克拱门将花费超过5000万英镑,包括与原始建筑材料的复苏有关的挑战。在10月16日的公安答复到迈克尔制造厂(保守,利奇菲尔德),关于将拱门重建为尤斯顿重建的一部分,Stephenson表示:“在Euston站的Masterplan,我们的发展伙伴,Lendlease,正在考虑历史的方式在尤斯通的车站应该影响并最好地反映在未来的设计中。“

著录项

  • 来源
    《Rail》 |2020年第917期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号