首页> 外文期刊>Rail >GWR winds down long-distance High Speed Train operations
【24h】

GWR winds down long-distance High Speed Train operations

机译:GWR结束了长途高速列车的运营

获取原文
获取原文并翻译 | 示例
           

摘要

WITH less than a month to go on long-distance services with Great Western Railway, the number of High Speed Train duties has been reduced again, with more replacement Class 802s accepted for traffic. From April 8, HSTs had five booked duties from London Paddington. However, on that day a sixth HST was in use in place of an unavailable Intercity Express Train (IET). This served Bristol Temple Meads and Cheltenham, where GWR HSTs are now rare visitors.
机译:大西部铁路(Great Western Railway)的长途服务时间不到一个月,高速火车的职责数量又被减少了,接受了更多的802代替换飞机。从4月8日起,HST从伦敦帕丁顿(London Paddington)订购了五份关税。但是,那天使用了第六个HST来代替不可用的城际特快列车(IET)。这曾为布里斯托尔米兹和切尔滕纳姆(Celtenham)提供服务,那里的GWR HST现在是稀有游客。

著录项

  • 来源
    《Rail》 |2019年第877期|28-29|共2页
  • 作者

    Richard Clinnick;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号