首页> 外文期刊>Rail professional >HS2 unveils the 'beating heart of HS2 in London' at its London logistics hub
【24h】

HS2 unveils the 'beating heart of HS2 in London' at its London logistics hub

机译:HS2推出了伦敦物流枢纽的“伦敦HS2击败HS2的心脏”

获取原文
获取原文并翻译 | 示例
       

摘要

HS2 has revealed the colossal logistics operation that is taking place at HS2's logistics hub near Willesden Junction. The 30-acre site will be the beating heart of the logistics operation for HS2 in London, and will be where earth from the 26 miles of tunnel will be processed and critical construction materials, such as pre-cast tunnel segment rings, will be delivered. The hub has been constructed and will be operated by HS2's Main Works Civils Contractor, Skanska Costain STRABAG joint venture (SCS JV). The construction of HS2's London tunnels will require 5.6million tonnes of earth to be excavated. After being processed at the site near Willesden Junction, it will be taken by train to three locations across the UK - Barrington in Cambridgeshire, Cliffe in Kent, and Rugby in Warwickshire - where it will put to beneficial reuse, filling voids which will then be used as a basis for redevelopment, such as house building.
机译:HS2揭示了在HS2在威尔斯顿交汇处附近的HS2的物流枢纽进行的巨大物流运作。 30英亩的网站将成为伦敦HS2的物流运作的心态,将在隧道26英里的地球将被加工和关键建筑材料,如预铸造隧道段环,将送达 。 该中心已建成,并将由HS2的主要作品民用承包商进行运营,Skanska Coderain Strabag合资(SCS JV)。 HS2伦敦隧道的建设需要挖掘5.6亿吨地球。 在在威尔斯斯顿交汇处附近的网站上加工后,将培训到英国的三个地点 - 巴林斯特郡,克伦特郡,克伦特郡,沃里克郡的橄榄球 - 将放在那里有益的重复使用,填充空隙,然后填充空隙 用作重建的基础,例如房屋建筑。

著录项

  • 来源
    《Rail professional》 |2021年第276期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号