首页> 外文期刊>Rail professional >Norwich depot prepares for longer trains
【24h】

Norwich depot prepares for longer trains

机译:诺威奇仓库准备更长的火车

获取原文
获取原文并翻译 | 示例
           

摘要

A Class 90 electric locomotive slammed through a banner at National Express East Anglia's Norwich Crown Point depot on Friday 8 October to mark the opening of its Road One, especially built to handle longer trains on the London Liverpool Street to Norwich service when the winter timetable starts in December.The completion of the depot extension adjacent to the Wensum Curve, outside Norwich station, was two months ahead of schedule. Carried out by Babcock Rail, the project involved installing new track, line side equipment, overhead power structures and buffers.
机译:10月10日,星期五,一架90级电力机车在国家快车东安格利亚的诺里奇皇冠点仓库通过横幅猛烈撞击,以标志其一号公路的通车,特别是为在冬季时间表开始时处理从伦敦利物浦街到诺里奇的长途火车去年12月,诺里奇站外的温苏姆曲线附近的仓库扩展完成了两个月。该项目由Babcock Rail进行,涉及安装新的轨道,线路侧设备,高架电源结构和缓冲器。

著录项

  • 来源
    《Rail professional》 |2010年第164期|p.8|共1页
  • 作者

    Peter Brown;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号