首页> 外文期刊>Rail International >New X 73500 d.m.u arrives in Luxembourg
【24h】

New X 73500 d.m.u arrives in Luxembourg

机译:全新X 73500 d.m.u抵达卢森堡

获取原文
获取原文并翻译 | 示例
       

摘要

With increasing train frequencies and constantly growing passenger volumes, CFL are coming dangerously close to their capacity limits. To keep pace with demand, the CFL Board has, therefore, decided to renew and adapt the vehicle fleet without delay as part of moves to improve quality of service. The factors dictating the choice of the new rolling stock included short delivery lead times, technical reliability, a high standard of passenger comfort and generous seating capacity. On 24 December 1999 the Board gave the green light for an order to be placed with ALSTOM S.A. for 6 d.m.u. trainsets built to the CFL specification.
机译:随着火车频率的增加和客运量的不断增加,CFL危险地接近其容量极限。因此,为了跟上需求的步伐,CFL董事会决定立即更新和调整车队,以提高服务质量。决定选择新机车车辆的因素包括交货时间短,技术可靠性,高标准的乘客舒适度和宽敞的座位容量。 1999年12月24日,董事会批准了阿尔斯通公司(ALSTOM S.A.)于6 d.m.u下达的命令。符合CFL规范的火车。

著录项

  • 来源
    《Rail International》 |2000年第11期|p.40|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁路运输;
  • 关键词

  • 入库时间 2022-08-18 00:18:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号