首页> 外文期刊>Rail business intelligence >Scottish Electrification Forges Ahead
【24h】

Scottish Electrification Forges Ahead

机译:苏格兰电气化向前迈进

获取原文
获取原文并翻译 | 示例
           

摘要

Addressing a conference in Glasgow last month, Scotland's First Minister Alex Salmond confirmed that preparatory work for electrification of the main line between Edinburgh Waverley and Glasgow Queen Street via Falkirk High was ahead of schedule. He expected 'key design contracts' to be signed during December.rnTogether with electrification north through Stirling to Alloa and Dunblane, construction of a new chord south of Dalmeny will enable some Edinburgh - Glasgow services to call at the planned rail/tram interchange at Gogar serving Edinburgh AirpoTt. Including some 22 other 'major infrastructure works', he expected the total Edinburgh -Glasgow Improvements Programme to be worth 'up to £1bn'.
机译:苏格兰首相亚历山大·萨尔蒙德(Alex Salmond)上个月在格拉斯哥举行的一次会议上证实,爱丁堡韦弗利(Edinburgh Waverley)和格拉斯哥皇后街(Falkirk High)之间的干线电气化的筹备工作提前进行了。他预计“关键设计合同”将在12月签署。rn加上斯特林以北的电气化,再到Alloa和Dunblane,在Dalmeny以南的新弦线的建设将使爱丁堡-格拉斯哥的一些服务能够在计划中的Gogar铁路/电车立交处进行服务爱丁堡AirpoTt。他还包括其他22项“主要基础设施工程”,预计爱丁堡-格拉斯哥改善计划的总价值将高达“ 10亿英镑”。

著录项

  • 来源
    《Rail business intelligence》 |2008年第332期|8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号