首页> 外文期刊>Rail Business Intelligence >Jacking error caused Liverpool Street bridge collapse
【24h】

Jacking error caused Liverpool Street bridge collapse

机译:顶升错误导致利物浦街桥坍塌

获取原文
获取原文并翻译 | 示例
       

摘要

Transport for London's final report on the bridge collapse which closed London Liverpool Street station to traffic from 19.15 on May 28 until 09.30 the next day (RB1319 p1) concludes that an error in the placement of packing plates under the east end of the new 1 300 tonne span was to blame. The structure dropped by 200 mm, and while the 84 m long Warren truss girder span was itself undamaged, the impact caused five concrete decking sections each weighing around 100 kg to fall onto the Great Eastern Main Line below. A National Express East Anglia service struck the slabs, sustaining minor damage. Built to carry the extended East London Line over the Liverpool Street throat, the span was launched during a closure of the busy London terminus on May 3 to 5.
机译:伦敦交通部关于桥梁倒塌的最终报告关闭了伦敦利物浦街车站,从5月28日的19.15到第二天的09.30(RB1319 p1)得出结论,即在新的1300东端下方放置填充板时发生错误每吨跨度应归咎于。建筑物下降了200毫米,而84毫米长的沃伦桁架梁跨度本身未受到损坏,但撞击导致五个重约100千克的混凝土铺面部分跌落到下方的大东部干线上。 National Express East Anglia的一个服务击中了板,造成较小的损坏。跨度是在5月3日至5日忙碌的伦敦终点站关闭期间启动的,目的是将延伸的东伦敦线运送穿过利物浦街的喉咙。

著录项

  • 来源
    《Rail Business Intelligence》 |2008年第325期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:17:15

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号