首页> 外文期刊>Rail Business Intelligence >Overground deep clean completed
【24h】

Overground deep clean completed

机译:地面深层清洁完成

获取原文
获取原文并翻译 | 示例
           

摘要

Transport for London announced on August 19 that it had completed the second phase of a programme to upgrade 34 stations inherited from Silverlink Metro. London Overground now manages stations on the Euston - Watford DC line, the North London Line from Richmond to Stratford and Gospel Oak - Barking, as well as Kensington Olympia on the West London Line. The first phase involved installing Oyster readers and providing additional staffing, and was completed soon after TfL took over in November 2007. The second phase has covered deep cleaning of platforms, ticket halls and waiting areas, as well as repainting and graffiti removal.
机译:伦敦交通局于8月19日宣布,它已经完成了计划的第二阶段,以升级从Silverlink Metro继承的34个车站。 London Overground现在管理着Euston-Watford DC线,从Richmond到Stratford的North London Line和Gospel Oak-Barking的车站,以及Western London Line的Kensington Olympia。第一阶段涉及安装Oyster读取器并提供额外的人员,并在TfL于2007年11月接手后不久完成。第二阶段涉及对平台,售票厅和等候区的深度清洁,以及重新粉刷和清除涂鸦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号