首页> 外文期刊>Rail Business Intelligence >ECML was not wired on the cheap
【24h】

ECML was not wired on the cheap

机译:ECML并不便宜

获取原文
获取原文并翻译 | 示例
           

摘要

During the sustainable power seminar, one topic listed for a panel discussion chaired by RBl's Founding Editor was 'what experiences can we learn from past electrification schemes?' This was dealt with comprehensively by Don Heath, Project Manager for BR's 1984-91 East Coast Main Line electrification project. 'One of the things which 1 was able to benefit from was the fact that it took no less than four years to get the project authorised', he said. 'During that time, we and our suppliers were able to get a lot of preparation done in the way of training people and making sure they had the right experience'.
机译:在可持续电力研讨会上,由RBl的创始编辑主持的小组讨论中列出的一个主题是“我们可以从过去的电气化计划中学到什么?” BR 1984-91年东海岸干线电气化项目的项目经理Don Heath对此进行了全面处理。他说:“ 1能够从中受益的一件事是,该项目获得授权的时间不少于四年。” “在那段时间里,我们和我们的供应商能够通过培训人员并确保他们具有正确的体验的方式来做很多准备工作。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号