首页> 外文期刊>Rail Business Intelligence >Shields Junction over-runs by one week
【24h】

Shields Junction over-runs by one week

机译:Shields Junction超支一周

获取原文
获取原文并翻译 | 示例
       

摘要

ORR has added Shields Junction in Glasgow to the list of over-running engineering blockades over Christmas that are to be investigated in depth (above). It involved major renewals and reconfiguration of this complex junction at a cost of £9m, as well as forming part of the project to renew signalling controlled from Glasgow Central. Significant changes to the track layout are also required to accommodate 15 min interval non-stop services to be introduced when the Glasgow Airport Rail Link opens. In addition to the short GARL branch from Paisley into the airport terminal, a third track is to be laid on what was once a four-track formation between Shields Junction and Wallneuk Junction, where the Gourock and Ayr lines diverge just to the east of Paisley Gilmour Street station.
机译:ORR已将格拉斯哥的Shields Junction添加到圣诞节期间将要进行深入调查的超速工程封锁清单中(上文)。它涉及到这个复杂路口的重大更新和重新配置,费用为900万英镑,并且是更新由格拉斯哥中央控制的信号传输项目的一部分。格拉斯哥机场铁路线开通时,还需要对轨道布局进行重大更改,以适应15分钟间隔的不间断服务。除了从佩斯利到机场航站楼的GARL短支路外,还将在Shields Junction和Wallneuk Junction之间的四轨编组上铺设第三条线路,Gourock和Ayr线在Paisley的东部分叉吉尔摩街站。

著录项

  • 来源
    《Rail Business Intelligence》 |2008年第310期|p.7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:17:04

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号