首页> 外文期刊>Rail Business Intelligence >Grand Central starts at last
【24h】

Grand Central starts at last

机译:大中央车站终于开始

获取原文
获取原文并翻译 | 示例
       

摘要

Grand Central Railway Company finally launched its open-access service between Sunderland and London King's Cross on December 18, when a single return trip was worked by its only operational IC125 set, reports Tony Miles. Plans to operate a temporary timetable with an 06.46 departure from Sunderland and the 16.50 from King's Cross supplemented by a return trip to York were shortlived when the sole HST failed and all services were cancelled on December 20 and 21. Engineering work on the East Coast Main Line over the Christmas period meant that there were no services on December 23 and 24. Services re-started on December 27 with the 12.30 train from Sunderland to London. Grand Central now expects to start a full service of three trains per day in each direction in the second half of January, although the necessary fleet of three IC125s was still not available at the start of the year.
机译:据Tony Miles报道,大中央铁路公司终于在12月18日启动了桑德兰与伦敦国王十字之间的开放式服务,当时唯一的运营IC125装置进行了一次回程。当唯一的HST失败并在12月20日和21日取消所有服务时,计划运行临时时间表的计划从桑德兰出发06.46,从国王十字出发的16.50加上返回约克的旅程很短。圣诞节期间的线路意味着12月23日和24日不提供服务。12月27日,从桑德兰到伦敦的12.30班火车重新开通。尽管今年年初仍无法提供三辆IC125的必要车队,但Grand Central现在预计将在1月下半月开始每天向每个方向提供三列火车的全面服务。

著录项

  • 来源
    《Rail Business Intelligence》 |2008年第309期|p.4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:17:01

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号