首页> 外文期刊>Rail business intelligence >Organisational quandary
【24h】

Organisational quandary

机译:组织困境

获取原文
获取原文并翻译 | 示例
       

摘要

Decisions on organising Public Members and the total number that should be appointed were bounced back to the Members' Review Group following the workshops held by NR Chairman Rick Haythornthwaite early in September.rnAt the workshops, Haythornthwaite indicated that he would prefer a single initial point of contact with the Members. Under his predecessor, Public Members were free to make direct contact to raise individual concerns.rnMRG thinking is that the need for an elected co-ordinator goes beyond contact with the NR board. For example, there is a need to arrange Members' meetings with ORR, to coordinate issues raised by Members and to advise the board on the strength of these views. Equally, there needs to be some way of collating the information needs of Members over and above those met by NR and putting this requirement to the company, ORR or seeking external advice.rnOn the issue of the size of the NR membership, it is likely that MRG will propose a reduction, but how this is to be achieved is not yet clear.
机译:在NR主席Rick Haythornthwaite于9月初举行的研讨会之后,有关组织公共会员和应任命的总人数的决定被退回给会员审核小组。rnrn在研讨会上,Haythornthwaite表示他更愿意选择一个初始点。与会员联系。在他的前任任职期间,公众成员可以自由直接联系以提出个人关切。MRG认为,选举民选协调员的需要超出了与自然资源保护委员会的联系。例如,有必要安排与ORR召开会员会议,以协调会员提出的问题并就这些观点的力量向董事会提供建议。同样,需要某种方式来整理NR所满足的会员之外的会员的信息需求,并将此需求提交给公司,ORR或寻求外部建议。在NR会员规模的问题上,很可能MRG将提议削减,但如何实现尚不明确。

著录项

  • 来源
    《Rail business intelligence》 |2009年第351期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:42

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号