首页> 外文期刊>Rail Business Intelligence >Electrostar Hits Another Snag
【24h】

Electrostar Hits Another Snag

机译:Electrostar打另一个障碍

获取原文
获取原文并翻译 | 示例
       

摘要

Following delivery delays caused by supply chain problems (RB1337 p6), Bombardier has now confirmed that current builds of Electrostar EMUs have encountered a potential structural problem. The item affected is the fabricated transverse beam from which under-floor equipment such as traction packages and auxiliaries are suspended. This welded structure is attached to the underframe of the aluminium bodyshell and contains mounting points for the under-floor equipment Taft. The problem is reported to be associated with weld quality. A Bombardier spokesman told RBI on March 10 that the company was still evaluating the impact of the welding issue. A test and repair specification would probably be developed to minimise the short-term impact on deliveries.
机译:由于供应链问题导致交付延迟(RB1337 p6),庞巴迪现已确认,当前的Electrostar EMU的制造遇到了潜在的结构性问题。受影响的物品是预制的横梁,悬垂了地板下的设备(例如牵引套件和辅助设备)。这种焊接结构固定在铝车身外壳的底架上,并包含用于地板下设备Taft的安装点。据报道,该问题与焊接质量有关。庞巴迪发言人于3月10日告诉印度储备银行,该公司仍在评估焊接问题的影响。可能会制定测试和维修规范,以最大程度地减少对交付的短期影响。

著录项

  • 来源
    《Rail Business Intelligence》 |2009年第338期|p.7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:16:32

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号