首页> 外文期刊>Rail Business Intelligence >Cautious Approach To New Combination
【24h】

Cautious Approach To New Combination

机译:谨慎对待新组合

获取原文
获取原文并翻译 | 示例
       

摘要

Network Rail is adopting a staged approach to the provision of the Automatic Train Operation system needed to meet the 24 trains/h throughput in the Thameslink central core reliably (p1). A special meeting of the DfT/Network Rail Joint Programme Board on November 18 2008 approved this strategy under which the new Thameslink EMUs will use ETCS from the start of service running in 2012. In this initial phase, on-train ETCS equipment would interface with the existing safety systems. A Specific Transmission Module would allow the onboard ETCS equipment to read and process data provided by existing Automatic Warning System magnets and Train Protection £t Warning System transmitters. Both AWS and TPWS are driven by the signalling system.
机译:Network Rail正在采用分阶段的方法来提供自动列车运行系统,以可靠地满足Thameslink中心核心的24列车/ h吞吐量(p1)。 DfT /网络铁路联合计划委员会于2008年11月18日召开的一次特别会议批准了此策略,根据该策略,新的Thameslink EMU将在2012年开始运营时就使用ETCS。现有的安全系统。特定的传输模块将允许车载ETCS设备读取和处理现有的自动警告系统磁铁和火车保护警告系统变送器提供的数据。 AWS和TPWS均由信号系统驱动。

著录项

  • 来源
    《Rail Business Intelligence》 |2009年第337期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:16:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号