首页> 外文期刊>Rail business intelligence >Managing the seasons pays off
【24h】

Managing the seasons pays off

机译:管理季节会有所收获

获取原文
获取原文并翻译 | 示例
       

摘要

According to Network Rail's National Weather Strategy Specialist Paul Arnold, '2009 was our most successful year in terms of safety and performance', and also in terms of delay-minutes due to bad weather.rnWrong-side track circuit failures caused by contamination of rails or wheel treads numbered 138 last year compared to 206 in 2008-09. The Moving Annual Average PPM score stood at 91-5% at the end of Period 5 on August 21 2010 (RB1374 p4), which is as high as it has ever been despite some exceptional weather as outlined in our table (right).
机译:根据Network Rail国家气象战略专家Paul Arnold的说法,就安全性和性能而言,2009年是我们最成功的一年,而且由于恶劣天气导致的延迟时间也是2009年.rn由于铁轨污染而导致的错误轨道线路故障去年,轮胎胎面的数量为138个,而2008-09年为206个。在2010年8月21日第5阶段结束时,移动年度平均PPM得分为91-5%(RB1374 p4),尽管我们表中列出了一些异常天气,但该数字仍达到了历史最高水平(右)。

著录项

  • 来源
    《Rail business intelligence》 |2010年第375期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号