首页> 外文期刊>Rail Business Intelligence >IIP puts government in the hot seat
【24h】

IIP puts government in the hot seat

机译:国际投资头寸使政府成为热门话题

获取原文
获取原文并翻译 | 示例
           

摘要

There is a sharp reminder in the Initial Industry Plan for CP5 (p1) that, following the McNulty Rail Value for Money Study, the ability of the railway to improve performance and capacity while cutting costs will depend on decisions to be made by government and ORR. 'There are important decisions ahead foT funders and regulators if the industry is to deliver more affordable railway that drives a prosperous low-carbon economy', says the document. A key decision will be whether DfT's promised franchise reform will really see the end of precisely-specified franchise agreements or a return to the flexibility provided in the first round of franchising in the 1990s, when operators specified and procured train fleets and developed timetables around minimum service levels. IIP argues that a return to such flexibility in the upcoming round of replacement franchises would deliver better value for money outputs, reduce costs and grow revenue.
机译:CP5(p1)的初始行业计划中强烈提醒我们,在进行麦克努尔蒂铁路物有所值研究之后,铁路在降低成本的同时提高性能和容量的能力将取决于政府和ORR的决定。 。该文件说:“如果该行业要提供更实惠的铁路来驱动繁荣的低碳经济,出资者和监管机构将面临重要的决定。”一个关键的决定将是DfT承诺的特许经营改革是否真正看到精确指定的特许经营协议的终结,还是回到1990年代第一轮特许经营中提供的灵活性,那时运营商确定并采购了火车车队并制定了时间表,服务水平。 IIP认为,在即将到来的一轮替代特许经营中恢复这种灵活性将带来更高的物有所值价值,降低成本并增加收入。

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第399期|p.7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号