【24h】

IN BRIEF

机译:在信中

获取原文
获取原文并翻译 | 示例
       

摘要

Container Line OOCL has renewed its contract with Freightliner Ltd for a further 10 years, including a commitment to increase by 50% the number of boxes to be transported. This will see daily services operating between the Port of Southampton and Birmingham, Leeds and Trafford Park. A 'key consideration' for OOCL was Freightliner's investment in rail-mounted cranes and handling equipment at Southampton. VTG Rail UK has signed a 10-year agreement with GB Railfreight to convert a further 21 HYA hoppers to carry pelletised biomass fuel to Drax power station. Currently undergoing conversion by WH Davis at Shirebrook, they will supplement 25 coal hoppers modified to carry biomass. DB Schenker is now operating an additional daily 12-car train for Royal Mail on a trial basis between Willesden and Shieldmuir, carrying traffic that previously moved by air.
机译:东方海外集装箱运输公司已与Freightliner Ltd续签了十年合同,其中包括承诺将要运输的箱子数量增加50%。这将使南安普敦港和伯明翰,利兹和特拉福德公园之间的日常服务运行。东方海外的一个“关键考虑因素”是Freightliner在南安普敦市购买的铁路起重机和搬运设备。英国VTG铁路公司已与GB Railfreight签署了为期10年的协议,将再转换21个HYA料斗,将颗粒状生物质燃料输送到Drax电站。 WH Davis目前正在Shirebrook进行改建,它们将补充25个经过修改的煤斗,以装填生物质。 DB Schenker现在正在试行在Willesden和Shieldmuir之间的每日额外的12列火车,用于Royal Mail,承载以前通过航空运输的交通。

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第398期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:57
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号